PROJECTS
Let’s talk


    Project Overview

    The Town of Garner requested that RKA provide drainage and erosion improvements for McCuller’s Road. RKA coordinated with the NCDOT to obtain approval of encroachment agreements and driveway permits. The roadway drainage system included approximately 1,500 LF of curb & gutter with 2,500 LF of pipe and 28 structures at an estimated construction cost of over $160,000 for the drainage portion of the project. Design included spread analysis for 1,500 LF of curb & gutter as well as median ditch design for Fayetteville Road and detailed analysis of area drainage where median crossovers were converted to leftovers with the use of concrete islands. Garner residents that drive on McCuller’s and Ten Ten Road now experience a safer drive around town.

    Location
    Raleigh, NC
    client
    The Town of Garner
    Project Features
    • Open and closed stormwater conveyance
    • Stormwater Ponds
    • Erosion and Sediment Control
    • Traffic Impact Studies and Traffic Simulations
    • Traffic Safety and Operational Studies
    • Roadway And Sidewalk Design Plans
    • Erosion Control Permitting
    Imagining A Limitless Future
    Start a New Project

    Tell us about your next project and learn how we can keep it moving forward.

    Start a project
    Join Our Team

    Find your perfect opportunity and learn what makes RKA a destination employer.

    Apply Now