PROJECTS
Let’s talk


    Project Overview

    RKA is providing traffic forecasting, planning and design services for proposed improvements to a 4.4-mile section of NC 5 in Aberdeen and Pinehurst, NC. The proposed project involves upgrading existing NC 5 from US 1-15-501/NC 211 in Aberdeen to Trotter Drive/Blake Boulevard in Pinehurst to a four-lane divided facility for a majority of the project before transitioning to a three-lane facility near Linden Road tying into the existing three-lanes near Trotter Drive. RKA is performing traffic forecasting for turn-lane recommendations and traffic signal design. NC 5 runs parallel to the Aberdeen Carolina & Western Railway (AC&W) so we are coordinating with the railroad to minimize impacts to the rail and to upgrade several at-grade crossing.

    Services provided by RKA and our subconsultants include the preparation of an environmental documentation, public involvement, traffic noise analysis, air quality analysis, roadway design, hydraulic design, erosion control, traffic management plans, pavement marking and signing plans, signal design, railroad coordination, geotechnical investigation / pavement design, and utility coordination.

    Location
    Aberdeen/Pinehurst, NC
    client
    North Carolina Department of Transportation
    Project Features
    • NEPA/SEPA Documentation
    • Traffic Noise Analysis
    • Air Quality Analysis
    • Traffic Signal Design
    • Roadway Design
    • Erosion Control
    • Railroad Design
    • Storm Drainage
    • Traffic Operations
    • Utlilty Coordination
    Imagining A Limitless Future
    Start a New Project

    Tell us about your next project and learn how we can keep it moving forward.

    Start a project
    Join Our Team

    Find your perfect opportunity and learn what makes RKA a destination employer.

    Apply Now